news center
Production News Express
2025-03-07 views 152
On the morning of March 7, the second 50,000DWT MR tanker "SEAMERIT" built by our group's New Yangzi Shipbuilding for Yangzijiang Financial Holding and Shipowner Scorpio, departed from the shipyard wharf and delivered to shipowner for operation.
The vessel measures 183m in length overall, scantling draft of 13.30m and service speed of 14.5 knots. Equipped with an open-loop U type scrubber, the vessel meets the EEDI Phase III standards, making it an energy-efficient, environmentally friendly, and highly competitive green tanker with excellent port adaptability. The vessel, which was built in accordance with the rules and regulations of ABS, cut the first plate in late March 2024, keel laid in mid-September, and launched in mid-November. The sea trial mission was successfully completed in mid-January 2025.
On March 4, "SEAMERIT" was signed and delivered.
2025.05.29
Delivery of 50,000DWT MR tanker "JAL KAILASH" built by Yangz…
2025.05.19
Delivery and Departure of the Second 8200TEU LNG (Membrane T…
2025.05.14
Delivery and Departure of The Fifth 50,000DWT MR tanker "INI…
2025.05.07
Delivery and Departure of Group's First 8200TEU LNG (Membran…
2025.05.05
Delivery and Departure of the Sixth 16,000 TEU LNG Dual-fuel…
2025.04.10
Delivery and Departure of one 50,000DWT MR tanker "DINO" bui…
2025.04.10
Delivery and Departure of the Fifth 16,000 TEU LNG Dual-fuel…
2025.04.08
Successful Delivery of 66000DWT bulk carrier "UM JIANGSU" bu…
2025.03.29
Delivery of First 50,000DWT MR tanker "JAL PRERANA" built by…
2025.03.24
Delivery and Departure of 4600 TEU Container Vessel "Xin Qin…